Centre for Organic Regeneration Construction (Whitby Campus)
Client:The Durham College of Applied Arts & Technology
Architect:J.R. Freethy Architects
Delivery Method:CCDC 2 – 2020
Capital Cost: $ 1,163,674.00
PROJECT DESCRIPTION:
The Centre for Organic Regeneration features a Composting Centre which houses a pre-purchased bio-digester.
The Composting Centre will be on a concrete pad with pedestrian door for access, equipment installation, and ventilation.
The Composting Centre includes:
i. HVAC
ii. Service for water
iii. Power
iv. Data
Adjacent to the Composting Centre will be a compost shed ‘Bio-Mass storage Shed’ which will have five bays, showcasing a warm and cold compost system.
Excavate and prepare the foundation of the two buildings prior to construction.
Corebuild is responsible for the Supply and install of the composter/bio-digester equipment and installation and will be responsible to assist the manufacturer representatives in the installation of the equipment.