ATV Farms
Client: ATV Farms
Architect: Marilyn Ypes Architect Inc
Location: Holland Landing, ON.
Delivery Method: CCDC2
Capital Cost: $55,000,000
PROJECT DESCRIPTION:
ATV Farms is a modern 108,000 square foot agricultural processing facility located in Holland Landing, Ontario. The single-storey building with a mezzanine level is designed specifically for processing and packaging carrots and onions at high capacity. The facility features seven loading docks, three for incoming goods and four for outbound shipments, supporting efficient logistics operations for the farm’s distribution needs.
The facility was delivered in two phases. Phase 1 encompassed all site grading, foundation work, stormwater services, and insulation, while Phase 2 included full building construction and finishing. The 102,922 square foot ground floor is complemented by a 5,078 square foot mezzanine dedicated to office functions, creating a comprehensive operational space for both processing and administrative activities.
Extensive site improvements were integrated into the project, including new paving, landscaping, curbs, and sidewalks designed for long-term durability and functionality. A complete on-site septic system was installed to meet the facility’s servicing requirements. Corebuild successfully delivered this modern agricultural processing facility on schedule, providing ATV Farms with a state-of-the-art operation tailored to their specific operational needs.